You don't have javascript enabled. Good luck with that.
Pencarian
 Pembangunan Jembatan Gantung Srengseng Sawah Capai 90 Persen
.
photo Erna Martiyanti - Beritajakarta.id

Srengseng Sawah Suspension Bridge Construction Reaches 90 Percent

Srengseng Sawah Suspension Bridge construction in Jagakarsa, South Jakarta currently reaches 90 percent. This bridge is targeted to be used by residents on August 15, 2018.

Now its construction reaches 90 percent. We plan to inaugurate it on August 15

Srengseng Sawah Urban Village Head, Tubagus Masruri mentioned, main building is already finished. It is only to do its finishing.

"Now its construction reaches 90 percent. We plan to inaugurate it on August 15," he informed, Tuesday (7/31).

Suspension Bridge Construction in Srengseng Sawah Started

Recently, the workers are installing its floor and railing. Meranti wood will be used for bridge's floor to beautify its appearance.

"This crossing bridge can only be used by pedestrian. We will forbid two-wheeled vehicles to use it," he affirmed.

After this bridge construction is finished and inaugurated, he plans to demolish the former suspension bridge. But his side needs to coordinate its demolition by coordinating with local residents first.

"We need to talk to local residents first because they built the former bridge independently," he conveyed.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye557 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye453 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye301 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye296 personTiyo Surya Sakti